加载中…

G3 Global Holdings will build a grain terminal at Port Metro Vancouver by 2020 at a cost above $500 million, with capacity of eight million tonnes annually. The project aims to increase wheat and canola shipments to Asia and Latin America, though some warn it could worsen port congestion.
Added export capacity from Vancouver could ease handling bottlenecks for Canadian wheat and canola over time, but congestion concerns could raise logistics costs in the interim.
在过去 163 次中性的物流事件之后,小麦(SRW) 在 5 个交易日内中位数变动 +0.1%(53% 上涨;中间一半区间为 -1.3% 至 +1.1%),20 个交易日内为 -0.3%。
历史可比事件尚不足,暂无法给出历史解读。
各商品基准价相对事件前最后收盘价的变动。历史数据汇总同类过往事件;仅描述已发生的情况,不代表未来走势。不构成投资建议。