Itafos reported that its Conda plant completed a reduced-scope turnaround in July with no environmental releases. It also disclosed a significant disruption in sulfuric acid supply from Rio Tinto's Kennecott smelter in Utah, which is delayed in restarting and is expected to be fully operational in about two months.
Sulfuric acid is a key input for phosphate processing, so reduced supply from the Conda plant could curb DAP output and support phosphate fertilizer prices.
Setelah 31 peristiwa logistik bullish sebelumnya, DAP bergerak median +0,5% selama 5 sesi (58% lebih tinggi; separuh tengah -0,4% sampai +0,9%), dan +1,6% selama 20 sesi.
Belum cukup peristiwa historis yang sebanding untuk analisis historis.
Pergerakan benchmark setiap komoditas dari penutupan terakhir sebelum peristiwa. Pembacaan historis menggabungkan peristiwa serupa di masa lalu; itu menggambarkan apa yang terjadi, bukan apa yang akan terjadi. Bukan nasihat investasi.
Sulfuric acid supply disruption from Kennecott delaying Itafos's Conda plant restart tightens North American DAP supply and supports prices.