# Korea Zinc clears 50% build at $100M Onsan germanium plant

> Korea Zinc said its dedicated germanium plant at the Onsan Smelter has reached the 50% construction mark. The 14-metric-ton annual recovery project in Ulsan remains on schedule for 2028 output. It would be South Korea's first domestic germanium refining capacity.

- Date: 2026-11-29 · published 2026-11-29T09:15:19.389Z
- Category: trade · region South Korea · magnitude low
- Page: https://feedsoft.ai/events/127502-korea-zinc-clears-50-build-at-100m-onsan-germanium-plant
- Commodities: [Zinc Oxide](https://feedsoft.ai/c/ZNO.md)

## Why it matters

China produces about 68% of refined germanium and has controlled exports since 2023, creating supply bottlenecks. The project reduces reliance on Chinese supply over time but has no near-term effect on feed commodity supply or prices.

## Sources

- eastasiabrief.com: https://eastasiabrief.com/energy-minerals/korea-zinc-clears-50-build-100m-onsan-germanium-plant-1866

---
Data from Feedsoft AI (https://feedsoft.ai/). For information only; not investment advice.
