# Energy costs drive Nyrstar's Dutch zinc production halt

> Nyrstar will stop zinc production at its Budel plant in the Netherlands on 30 November, citing higher site energy costs and difficult market conditions for smelters. The company is reviewing the site's future and says it does not expect permanent-staff redundancies from the stop.

- Date: 2026-11-27 · published 2026-11-27T06:14:20.449Z
- Category: macro · region Europe · magnitude low
- Page: https://feedsoft.ai/events/123593-energy-costs-drive-nyrstar-s-dutch-zinc-production-halt
- Commodities: [Zinc Oxide](https://feedsoft.ai/c/ZNO.md)

## Why it matters

The halt reflects energy-driven cost pressure on European industrial output, which can tighten metals supply and lift prices. Zinc is not a feed commodity, so direct effects on feed markets are limited.

## Sources

- euromining.news: https://euromining.news/energy-costs-drive-nyrstars-dutch-zinc-production-halt/

---
Data from Feedsoft AI (https://feedsoft.ai/). For information only; not investment advice.
