# Netherlands' Budel zinc smelter to halt production at end of November as energy costs crush smelting; zinc prices briefly rise over 5%

> Nyrstar, owned by Trafigura, announced that its Budel smelter in the Netherlands will stop zinc production from November 30 because energy costs have risen sharply. LME three-month zinc briefly rose 5.3% intraday on November 26, its largest intraday gain since late January. The plant has a design capacity of 315,000 tonnes per year, but actual output before the halt was not disclosed.

- Date: 2026-11-27 · published 2026-11-27T03:14:29.655Z
- Category: macro · region EU · magnitude low
- Page: https://feedsoft.ai/events/123469-netherlands-budel-zinc-smelter-to-halt-production-at-end-of-november-as-energy
- Commodities: [Zinc Oxide](https://feedsoft.ai/c/ZNO.md)

## Why it matters

The halt affects zinc, not feed ingredients, so there is no direct feed-price effect. It is a reminder that high European energy costs are shutting metal smelters, a pattern that also appears in fertiliser production.

## Sources

- uanalyze.com.tw: https://uanalyze.com.tw/articles/9061261576

---
Data from Feedsoft AI (https://feedsoft.ai/). For information only; not investment advice.
