# Gara Djebilet, Bled El Hadba: Algeria, where mining takes place at press conferences | le360.ma

> Ten months after the Gara Djebilet iron ore project was inaugurated in February 2026, no production figures have been released beyond a single December 2025 blast of 75,000 tonnes. Satellite images from November 2026 show no visible expansion of mining operations or ore stockpiles at the site. The article also notes a $5.3 billion phosphate megaproject whose cost and timeline have shifted repeatedly.

- Date: 2026-11-26 · published 2026-11-26T12:12:46.679Z
- Category: report · region Algeria · magnitude low
- Page: https://feedsoft.ai/events/122311-gara-djebilet-bled-el-hadba-algeria-where-mining-takes-place-at-press
- Commodities: [Phosphate Rock](https://feedsoft.ai/c/PHOSROCK.md)

## Why it matters

The article concerns iron ore and phosphate project delivery in Algeria rather than feed commodity supply, so the direct effect on feed-commodity prices is negligible. Any future phosphate output from Algeria would be a minor additional source for fertilizer and feed-phosphate markets.

## Sources

- en.le360.ma: https://en.le360.ma/world/gara-djebilet-bled-el-hadba-algeria-where-mining-takes-place-at-press-conferences_LPEICSB375FHPJ6EXNQM5WKSMU/

---
Data from Feedsoft AI (https://feedsoft.ai/). For information only; not investment advice.
