# Endeavour Silver Completes Feasibility Study for Pitarrilla Project Showing After-Tax NPV of US$736 Million

> Endeavour Silver released a feasibility study for its Pitarrilla silver project in Durango, Mexico. The study plans a mechanized underground mine processing 4,000 tonnes per day, with average output of 7.5 million oz silver equivalent over an 18-year mine life, a projected after-tax NPV of US$736 million at a 5% discount rate, and initial capital of US$585 million.

- Date: 2026-11-22 · published 2026-11-22T18:14:35.555Z
- Category: report · region Mexico · magnitude low
- Page: https://feedsoft.ai/events/115189-endeavour-silver-completes-feasibility-study-for-pitarrilla-project-showing
- Commodities: [Zinc Oxide](https://feedsoft.ai/c/ZNO.md)

## Why it matters

This is a silver mining project with no direct effect on feed commodities. It adds to long-term precious metals supply but does not move feed prices.

## Sources

- coinsinsight.com: https://coinsinsight.com/1111992962/Endeavour-Silver-Completes-Feasibility-Study-For-The-Pitarrilla-Project-Delivering-After-Tax-NPV-Of-736-Million-Study-Highlights-A-Long-Life-Low-Cost-Growth-Opportunity-With-Significant-Free-Cash-Flow-Potential

---
Data from Feedsoft AI (https://feedsoft.ai/). For information only; not investment advice.
