# Endeavour Silver Maps $585 Million Pitarrilla Mine, With Production Possible by 2030

> Endeavour Silver outlined an 18-year underground mine at its Pitarrilla project in Durango, Mexico, with initial construction costs of $585 million. The feasibility study projects 5.4 million ounces of silver, 13,000 tons of lead and 29,000 tons of zinc a year, with production possible in 2030 subject to permitting.

- Date: 2026-11-21 · published 2026-11-22T09:15:28.298Z
- Category: market · region Mexico · magnitude low
- Page: https://feedsoft.ai/events/114698-endeavour-silver-maps-585-million-pitarrilla-mine-with-production-possible-by
- Commodities: [Zinc Oxide](https://feedsoft.ai/c/ZNO.md)

## Why it matters

This is a long-dated mining project with no near-term effect on feed supply or prices. Silver and zinc output would only matter to feed buyers once the mine is built.

## Sources

- tradingview.com: https://www.tradingview.com/news/marketbeat:e37167a4d094b:0-endeavour-silver-maps-585-million-pitarrilla-mine-with-production-possible-by-2030/

---
Data from Feedsoft AI (https://feedsoft.ai/). For information only; not investment advice.
