# Upper Mississippi Winter Maintenance Targets Lock Reliability and Safety

> The U.S. Army Corps of Engineers' St. Paul District is carrying out winter-closure work on the Upper Mississippi River, including a $12.8 million contract to replace kevel systems at Locks 2 and 3 in Minnesota. Crews are also upgrading miter gate anchorage plates at Locks 5 and 6 ahead of heavier replacement gates.

- Date: 2026-11-20 · published 2026-11-20T18:12:13.287Z
- Category: logistics · region US · magnitude low
- Page: https://feedsoft.ai/events/110509-upper-mississippi-winter-maintenance-targets-lock-reliability-and-safety
- Commodities: [Barge Freight (St. Louis)](https://feedsoft.ai/c/BARGE.md)

## Why it matters

Improved lock turnaround should reduce barge delays during the next navigation season, which supports grain movement from the upper Midwest. The effect on feed prices is small and mainly limited to freight timing.

## Sources

- irpt.net: https://www.irpt.net/upper-mississippi-winter-maintenance-targets-lock-reliability-and-safety/

---
Data from Feedsoft AI (https://feedsoft.ai/). For information only; not investment advice.
