# St. Paul District Uses Winter Closure For Major Lock And Dam Maintenance

> The St. Paul Engineer District is scheduling several major lock and dam projects during the annual winter navigation closure on the Upper Mississippi River. Work includes replacing traveling kevel systems at Locks 2 and 3 under a $12.8 million contract with Kramer North America.

- Date: 2026-11-18 · published 2026-11-19T00:10:15.362Z
- Category: logistics · region US · magnitude low
- Page: https://feedsoft.ai/events/107380-st-paul-district-uses-winter-closure-for-major-lock-and-dam-maintenance
- Commodities: [Barge Freight (St. Louis)](https://feedsoft.ai/c/BARGE.md)

## Why it matters

Maintenance during the closure aims to reduce future lock delays for barge traffic that moves grain and feed ingredients, though the work itself does not change current river supply. Its price effect on feed markets is minimal.

## Sources

- waterwaysjournal.net: https://www.waterwaysjournal.net/2026/11/18/st-paul-district-uses-winter-closure-for-major-lock-and-dam-maintenance/

---
Data from Feedsoft AI (https://feedsoft.ai/). For information only; not investment advice.
